An error occurred fetching the project authors.
- 07 Aug, 2022 1 commit
-
-
Robert Schmidt authored
-
- 01 Aug, 2022 1 commit
-
-
luis_pereira87 authored
The physical layer imposes a limit to the maximum size a SIB can take. The maximum SIB1 or SI message size is 2976 bits.
-
- 16 Jun, 2022 1 commit
-
-
Roberto Louro Magueta authored
-
- 24 May, 2022 1 commit
-
-
Roberto Louro Magueta authored
-
- 19 May, 2022 1 commit
-
-
KARIM BOUTIBA authored
-
- 04 May, 2022 1 commit
-
-
Roberto Louro Magueta authored
-
- 30 Mar, 2022 1 commit
-
-
Raphael Defosseux authored
Signed-off-by:
Raphael Defosseux <raphael.defosseux@eurecom.fr>
-
- 18 Mar, 2022 1 commit
-
-
Robert Schmidt authored
-
- 14 Feb, 2022 1 commit
-
-
francescomani authored
-
- 11 Feb, 2022 2 commits
-
-
francescomani authored
-
francescomani authored
-
- 26 Jan, 2022 1 commit
-
-
francescomani authored
-
- 21 Jan, 2022 1 commit
-
-
francescomani authored
-
- 20 Jan, 2022 1 commit
-
-
francescomani authored
-
- 12 Jan, 2022 2 commits
-
-
luis_pereira87 authored
-
luis_pereira87 authored
-
- 22 Dec, 2021 1 commit
-
-
francescomani authored
-
- 15 Dec, 2021 1 commit
-
-
Raymond Knopp authored
-
- 28 Nov, 2021 1 commit
-
-
rmagueta authored
-
- 12 Nov, 2021 1 commit
-
-
matzakos authored
-
- 28 Sep, 2021 1 commit
-
-
Laurent THOMAS authored
-
- 27 Sep, 2021 1 commit
-
-
matzakos authored
-Trigger UE context setup response at the DU and RRC Reconfiguration at the CU upon reception of UE context setup response. -Pending: The DU should generate some updates on the master cell groupconfig based also on the received UE capabilities and add them in the UE context setup response message so that they can be included in the RRC Reconfiguration message sent from the CU. For the moment the corresponding function is empty. -Next steps: trigger UE context modification procedures
-
- 01 Sep, 2021 1 commit
-
-
Eurecom authored
-
- 23 Aug, 2021 1 commit
-
-
Michael Cook authored
-
- 02 Jul, 2021 1 commit
-
-
Abhijith authored
-
- 20 May, 2021 1 commit
-
-
Melissa Elkadi authored
The eNB may only check for RRC_Complete in EPC mode. Need to look at this further. Updated how we pass the RRC_Complete msg from NR UE to LTE UE. Need to still handle transaction_id from dl_dcch_msg in the LTE UE and trans_id from nr_dl_msg.
-
- 12 May, 2021 1 commit
-
-
rmagueta authored
-
- 11 May, 2021 1 commit
-
-
rmagueta authored
-
- 02 May, 2021 1 commit
-
-
Raymond Knopp authored
changes in gtpu interface for testing, small changes in L1 for PUSCH signal/noise measurements. SRB2 interfaces.
-
- 30 Apr, 2021 1 commit
-
-
Raymond Knopp authored
-
- 23 Mar, 2021 1 commit
-
-
Raymond Knopp authored
added generation of initial Master Cell Group Configuration for both CU/DU and monolithic gNB. Tested until transmission of RRCSetupComplete from UE
-
- 26 Jan, 2021 1 commit
-
-
Xue Song authored
-
- 17 Dec, 2020 1 commit
-
-
Xue Song authored
-
- 15 Dec, 2020 1 commit
-
-
yaojie authored
-
- 14 Dec, 2020 1 commit
-
-
Xue Song authored
-
- 11 Dec, 2020 2 commits
- 26 Nov, 2020 1 commit
-
-
Xue Song authored
-
- 28 Oct, 2020 2 commits